October release readiness ledger

Historical preparation snapshot: v2026.10.0 was published on 1 October 2026. The statuses and authorization steps below describe its preparation at that time. For November and subsequent releases, follow the current release approval policy: a normal PR approval is sufficient; the separate exact-commit/draft-ID authorization recorded here is superseded.

Reviewed: 1 October 2026. Target: v2026.10.0, chart 2026.10.0. Status: release preparation — do not tag or publish yet.

Preparation base: 15c14d7d662661b53f76c457a8b0606b7b97481e on main. Previous published release: v2026.9.2. This ledger describes local release preparation, not passing CI for an immutable final candidate. Record the final reviewed/merged SHA and evidence links below before publication. Preparation branch: pr/johalley/october-release.

Scope and version alignment

  • Chart source appVersion, install/upgrade examples, website and maintainer runbook target v2026.10.0. The source chart retains version: 0.1.0; tag automation stamps packaged chart 2026.10.0.
  • The curated release notes cover the September-to-October delta, including secure gNOI provisioning, topology projection, combined rollouts, source selection and opt-in development-preview drain.
  • Existing installations apply the complete reviewed chart CRD directory: new IOSXESoftwareRollout, changed CiscoDevice, IOSXESoftwareUpgrade and IOSXEOperationalAction, plus the unchanged shipped CRDs. Back up schemas and data; validate migration and admission before enabling gates.
  • November's staged activation, network-policy/observation, graph, scale and wider topology work stays on pr/johalley/tas-extentions. No branch merge or cherry-pick is part of this preparation.
  • Examples explicitly require publication; use the published September artifacts until then. Do not create another September tag or publish its rejected drafts. Recovery after an October tag requires v2026.10.1.

End-user documentation coverage

Surface October updates
README Feature summary, operator task/boundary table, native scheduling versus rollout admission, release and migration links
MkDocs Welcome/maturity tables, managed-mode architecture responsibilities, release notes and readiness navigation, install/CLI/CRD upgrade examples
Dynamic website Hero and metadata, topology placement/rollout/secure gNOI/preview drain cards, functional identity boundary, app-hosting diagram scope and release links

All three overviews distinguish implemented October capabilities from deferred November work, experimental TAS and preview drain. Declared topology is not proof of healthy forwarding paths, spare capacity or uninterrupted service.

Local checks on the preparation worktree

These results are preflight evidence only and must be repeated/linked from the protected release PR and final candidate. Go tests include cached results. Local toolchain: Go 1.26.7, Python 3.10.13 for script tests, Helm 4.1.3, MkDocs 1.6.1. Final docs/license validation used an isolated Python 3.13.2 environment with hash-verified requirements.txt; the ambient Python failed the locked-version check and was not used as license evidence. Python 3.13.15 was unavailable through the local interpreter manager. Release-pinned Helm 3.21.4/4.2.4 and CI Python 3.13.15 must still be qualified.

Check Local result Release boundary
go test -race ./... PASS Root runtime suite; not real-API or hardware acceptance
go vet ./..., go mod verify, build controller/plugin PASS Does not build/sign both release image architectures
make crd-gen deepcopy-gen rbac-gen helm-sync-crds, twice; make parity-matrix config-docs PASS, no generated diff Existing controller-gen v0.16.5 works on this main baseline; November tooling observations must not be transferred blindly
helm lint and charts/cisco-virtual-kubelet/tests/topology-render-test.sh PASS Ambient Helm 4.1.3; repeat pinned Helm lanes and actual install/upgrade
make test-envtest with Kubernetes 1.35 assets PASS: provider and controller real-apiserver suites Local API/admission evidence; hosted CI must repeat on the final merged SHA
charts/cisco-virtual-kubelet/tests/topology-kind-test.sh on disposable Kubernetes 1.35 kind PASS Native topology admission/default-scheduler evidence; no physical forwarding qualification
charts/cisco-virtual-kubelet/tests/managed-shared-worker-kind-test.sh --cluster-name cvk-october-shared PASS Shared app-hosting/network-management identity, stale-token, drain and deletion-boundary evidence
Release contract / plugin packaging / Krew rendering unit tests PASS: 16 / 15 / 9 tests New regressions verify October metadata, CRD upgrade scope, tag-pinned note rendering and feature/limitation coverage across all three overviews
Root govulncheck@v1.7.0 Exit 0, no reachable vulnerable symbols Two imported-package and one required-module findings remain for image/security review; see below
Terraform module govulncheck@v1.7.0 PASS, no vulnerabilities reported Repeat on final candidate
Website lint/build and license checks PASS after patch-level dependency remediation; rendered feature cards inspected in browser Static build is not a signature or publication check
npm audit --audit-level=high PASS, zero findings after remediation Recheck advisory database at release time
Strict MkDocs, deployed-runtime licenses and workflow lint PASS with locked Python dependencies; actionlint v1.7.12 passed GitHub release notes also rendered successfully with tag-pinned local links

Security findings and disposition

The initial website audit failed. Preparation updates next and eslint-config-next from 16.3.4 to 16.3.8, and locks brace-expansion to 5.0.12 and dompurify to 3.4.16; the website license inventory was regenerated. Relevant advisories: Next.js, brace-expansion, DOMPurify. These dependency findings are not a claim that the static site exposed every affected execution path. The pinned Mermaid browser bundle was not replaced; its audited vendored DOMPurify version remains separately inventoried.

Root Go scan findings not on reported reachable symbol paths:

Advisory Found / scanner-reported fix Required disposition
GO-2026-6107 etcd client/pkg v3.6.5 / v3.6.14 Review release-binary/image inventory and fix or document non-applicability; hard fixed HIGH/CRITICAL image gate cannot be waived by a source reachability result
GO-2026-6094 cel-go v0.29.0 / v0.30.0 Same review; retain CEL/API compatibility tests if updated
GO-2026-5932 x/crypto v0.56.0, openpgp; no fix listed Confirm unused openpgp is absent from shipped executable paths; record security disposition

This preparation does not silently update Kubernetes/etcd/CEL runtime dependencies or mark image scanning complete. An unresolved applicable finding remains a no-go.

Outstanding go/no-go gates

Gate Required evidence / action Status
Reviewed preparation commit Protected PR from pr/johalley/october-release into main; record final merged SHA, reviews and all required checks from RELEASE.md PR #195 checks PASS; review/merge and final SHA still pending
Baseline real API and admission Kubernetes 1.35 envtest/kind, default scheduler, native admission, functional-account permissions, wrong/stale worker denials, migration from September PASS locally on this candidate: envtest, topology/default-scheduler integration and shared-worker admission suites; repeat/attach protected evidence after any PR change
Independent optional TAS lane Version/feature-gate-pinned experimental scheduler conformance; accurately describe fixture vs physical coverage PASS: protected native-tas-conformance on PR #195; fixture conformance is not full physical CVK group lifecycle
Hardware qualification Cat8kv/Cat9k protected checks on final revision; .100, .101, .103 combined upgrade and downgrade with complete manifests, worker/device logs and final ownership/guard/Lease/ledger state Pending: approval-driven hosted lab contexts have not run on PR #195; do not rerun destructively from this checklist without confirming current lab ownership/window
Preview drain disposition Reproduce delayed callback/stale Running status/evidence-abort behavior on the October candidate; review minimal fix or explicit release-scope decision; verify supported automatic relocation with probes Open publication hold: proposed scope is disabled-by-default development preview only; requires maintainer decision and no production-continuity claim
Remaining security/artifact checks Both Linux image scans, SBOMs, license inventory, pinned tool verification, actual plugin execution on each platform Pre-merge smoke image scans, govulncheck, website/MkDocs licenses and dependency audit PASS; release-stage SBOM/signature/plugin artifact verification remains pending
Install/upgrade/rollback Fresh install and September migration, stored CR compatibility, retained-operation recovery and guard restoration Pending exact candidate
Release authorization Approved signing identity and a second maintainer's exact-commit/draft-ID authorization, as specified in RELEASE.md Pending
Staging/publish verification Exactly 16 signed/verified draft assets, chart/image digests, alias promotion, post-stage checks, then manual publish Not started; no draft or tag created

Later dirty development builds are archived in the separate November checkpoint. Their successful device transitions and stopped collectors are useful for triage, not qualification of this main candidate. Do not import its broad unfinished runtime changes into October just to claim a green result.

Next actions, in order

  1. Review the locally validated preparation diff on pr/johalley/october-release through the protected release PR process; do not push directly to main or tag the preparation branch.
  2. Resolve the security/image and preview-drain dispositions in bounded, reviewed changes. If code changes, rerun local and relevant API tests.
  3. Run all protected checks and physical qualification on the candidate; attach durable sanitized evidence. Resolve failures; do not reuse checks from another SHA or dirty image.
  4. Merge the preparation PR and freeze the exact main commit. Fill in the record below. Render the curated notes with .github/scripts/render_github_release_notes.py for v2026.10.0.
  5. Follow the release runbook: draft first, second maintainer authorization, signed immutable tag, artifact verification, then manual publication. Never conflate preparing notes with publishing.

Final release record — maintainer fills before tagging/publishing

Field Value
Preparation PR / approvals Pending
Final main SHA / clean source Pending
Protected CI / API / hardware evidence Pending
Security and drain disposition Pending
Draft ID / reviewed rendered notes Pending
Independent maintainer authorization Pending
Signed tag / signing identity Pending
OCI image/chart digests, scans, SBOM/signature verification Pending
16-asset verification and publication Pending