E13 final-candidate physical upgrade/downgrade matrix

Date: 2 October 2026
Runtime commit: 6f3686e9
Cluster: Ubuntu16, Helm revision 157
Cohort: three physical C9300 IOS XE devices

This record closes the coherent three-device upgrade/downgrade matrix for the capabilities and cohort stated below. It does not turn missing traffic, application, second-platform or cross-cluster inputs into passing evidence.

Candidate identity

The manager and all six C9K app/network workers ran cvk-tas-extentions:6f3686e9. The Linux/amd64 image config digest was sha256:8b1ded747f105cab4d3eaf613bae98f6ad26005a4c7fbcb18c3c338157a623e7; the Docker manifest-list digest was sha256:2ccddc233fd92b700070c021cb51560d4530e38ea3b2ee4db91d303bcac03aee.

6f3686e9 fixes retained preparation retirement after an exact activation has already succeeded and settled. A topology-policy ConfigMap resourceVersion may change for metadata-only reasons within the same policy epoch. Requiring that resourceVersion forever kept an otherwise consumed receipt in the queue. The fix still requires the same policy UID and epoch, exact receipt/activation identity and content, terminal success, verified target version and manager plus worker settlement. Tests reject a changed policy UID or epoch.

Executed sequence

Direction Campaign Approved plan Result
17.18.03 to 17.18.02 roadmap-final-b8c713ff-downgrade-20261002 sha256:992f69e0d603552a84af15fb7d605c53793b4f552d59a5d151cb0b3c9f874c8a Three of three Succeeded; exact running and validated version 17.18.02.0.4112.1766116039
17.18.02 to 17.18.03 roadmap-final-6f3686e9-upgrade-20261002 sha256:5ed6851739be06e9baeff76db33ef520e868774c680d50a9204507bbace62c11 Three of three Succeeded; exact running and validated version 17.18.03.0.5496.1776157760

Both plans selected the exact three-device physical cohort, pinned an image digest and source identity, froze device/Node/physical identities and required an explicit approval of the resulting plan hash. The downgrade transferred 1,247,897,709 bytes per target. The return upgrade transferred 1,249,368,115 bytes per target.

The canary ran first. Remaining targets progressed serially under maxUnavailable: 1 and maxConcurrentTransfers: 1 at the global, region, zone, redundancy-domain and cache-domain boundaries that applied to the targets. While one device was unavailable, peers visibly remained blocked by the topology budget rather than claiming a second mutation. The return order was canary, .103, then .101.

Safety and recovery observations

  • Every leaf recorded exactly one primary install and one primary activation claim for its reservation. IOS XE's lost terminal install response was reconciled from exact native install inventory; activation recovery observed the recorded request and did not replay it.
  • Reload recovery followed the expected sequence of timeout, connection refusal, temporarily unavailable IOS XE authentication service and final secure gNOI OS.Verify success.
  • A transient .103 manager-accepted network-evidence mismatch blocked the claim before mutation. The manager renewed the grant only after a new exact accepted sample, after which the worker claimed safely.
  • All six leaves finished Succeeded/Settled, both parents reported Succeeded, every post-mutation health gate passed, and the topology ledger ended with no reservations.
  • After each direction all three virtual Nodes returned Ready=True/KubeletReady; no maintenance taint or mutation holder remained.

A final read-only cluster check after the merged-head local gates again found the three cohort Nodes Ready on IOS XE 17.18.3, the manager and each cohort worker Pod Running on cvk-tas-extentions:6f3686e9, and reservations: {} in the topology ledger. This check did not mutate devices or replace the campaign's exact CLI and secure OS.Verify evidence.

Workload boundary

The previously qualified app-hosting fixture on the canary was restored and reached Running. A second historical fixture on .101 used the unsigned flash:/nginx.tar package and remained in ContainerCreating. The fixture was scaled back to zero after capture. Correction: fresh device inventory shows USB-backed IOx on .101; the earlier attribution to absent storage was incorrect. Neither signature rejection nor the activation failure's root cause was established. See the follow-up diagnosis.

This is not E07 service-continuity evidence: there was no portable signed package and independent endpoint probe spanning the complete disruption.

Local raw evidence

The raw bundle remains local because it contains lab addresses, Secret references and maintenance-session identifiers:

/tmp/cvk-6f3686e9-final-matrix.tar.gz

SHA-256: 2c80a38eef4cefd4a794c351aa9112884552fc4750be86af579a5777c854eac8

The bundle contains the pre-apply manifests, approved and final parent/leaf objects, candidate Deployment inventory, Nodes after both directions, manager/network-worker logs and the explicit unsupported-app capture. The raw archive is evidence for the local operator, not a redistributable repository artifact.

Closure and remaining gates

This run closes the E13 final-candidate matrix for topology-budgeted IOS XE 17.18.02/17.18.03 software mutation on the tested C9300 cohort, including the same-epoch retained-receipt regression. The following remain open and must be reported as prerequisites for broader roadmap completion:

  • E02/E03: independently generated forwarding load and declared redundant, singleton, critical-service and congested-path loss tolerances;
  • E04/E05 extension: safe native image removal/replacement and explicit prepared-receipt invalidation;
  • E07: portable signed app, independent endpoint continuity, no-spare-capacity and restart/cancel qualification;
  • E08-C/D: a supported native Workload controller on physical CVK Nodes and group-aware physical drain/lifecycle;
  • E11: a qualified second-platform image pair and service evidence;
  • E12-D: a second cluster and offline ownership-transfer procedure, plus production throughput beyond the synthetic envelope.